Case Study

Instructions

Read the case study which is below, “The Paradoxical Twins: Acme and Omega. After reading this case study write a paper that responds to the following questions. This needs to be in narrative form, not question and answer form. What I mean is I don’t want to see “Question One” –then—the answer to question one, I want you to write about the issues the question brings up.

Don't use plagiarized sources. Get Your Custom Essay on
Case Study
Get an essay WRITTEN FOR YOU, Plagiarism free, and by an EXPERT!
Order Essay

I highly advise that you have an introduction and summary of the case study and any observations you would like to make before you begin the analysis. You also may use outside resources if you should choose to get creative.

1. What are the goals at Acme? At Omega?

2. What impact do top managers have on these goals? Discuss.

3. Are these goals to be achieved with different strategies? Describe.

4. Which firm do you think will produce the best results? Why?

5. Which organization was more effective at developing the prototype and meeting the deadlines?

6. Was its level of effectiveness due to the goals chosen by top management?

7. Predict which organization will get the final contract. Why?

8. How can Acme’s success be explained? Did Acme’s goals seem more appropriate? Did stakeholder satisfaction play a role?

9. Overall, who was more effective, Acme or Omega? Explain in detail.

Besides answering or addressing the questions I also expect you to get outside these questions meaning be creative and address any issues you see that I haven’t addressed in these questions.

The case study is due until the 18th of November.

Also please remember that this is a paper needs a cover page, needs to be double spaced and have a reference page that are in compliance with the guidelines set forth in the APA manual (this means at the minimum I want a cover/title page, reference page with properly formatted references and page numbers, also remember that each new paragraph needs to be indented five spaces, usually just done by either setting it up for automatically doing that in your word processor or by using the tab key). 5 to 7 pages and the quality of the content and not the quantity (big words and large run on sentences and paragraphs don’t impress me). Scholastic articles will need to be used and attached with the case study.

Case Study

CASE FOR ANALYSIS | The Paradoxical Twins: Acme and Omega Electronics87

Part I

In 1986, Technological Products of Erie, Pennsylvania, was bought out by a Cleveland manufacturer. The Cleveland firm had no interest in the electronics division of Technological Products and subsequently sold to different investors two plants that manufactured computer chips and printed circuit boards. Integrated circuits, or chips, were the first step into microminiaturization in the electronics industry, and both plants had developed some expertise in the technology, along with their superior capabilities in manufacturing printed circuit boards. One of the plants, located in nearby Waterford, was renamed Acme Electronics; the other plant, within the city limits of Erie, was renamed Omega Electronics, Inc.

Acme retained its original management and upgraded its general manager to president. Omega hired a new president who had been a director of a large electronic research laboratory and upgraded several of the existing personnel within the plant. Acme and Omega often competed for the same contracts. As subcontractors, both firms benefited from the electronics boom and both looked forward to future growth and expansion. The world was going digital, and both companies began producing digital microprocessors along with the production of circuit boards. Acme had annual sales of $100 million and employed 550 people. Omega had annual sales of $80 million and employed 480 people. Acme regularly achieved greater net profits, much to the chagrin of Omega’s management.

Inside Acme

The president of Acme, John Tyler, was confident that, had the demand not been so great, Acme’s competitor would not have survived. “In fact,” he said, “we have been able to beat Omega regularly for the most profitable contracts, thereby increasing our profit.” Tyler credited his firm’s greater effectiveness to his managers’ abilities to run a “tight ship.” He explained that he had retained the basic structure developed by Technological Products because it was most efficient for high-volume manufacturing. Acme had detailed organization charts and job descriptions. Tyler believed everyone should have clear responsibilities and narrowly defined jobs, which would lead to efficient performance and high company profits. People were generally satisfied with their work at Acme; however, some of the managers voiced the desire to have a little more latitude in their jobs.

Inside Omega

Omega’s president, Jim Rawls, did not believe in organization charts. He felt his organization had departments similar to Acme’s, but he thought Omega’s plant was small enough that things such as organization charts just put artificial barriers between specialists who should be working together. Written memos were not allowed since, as Rawls expressed it, “the plant is small enough that if people want to communicate, they can just drop by and talk things over.”

The head of the mechanical engineering department said, “Jim spends too much of his time and mine making sure everyone understands what we’re doing and listening to suggestions.” Rawls was concerned with employee satisfaction and wanted everyone to feel part of the organization. The top management team reflected Rawls’s attitudes. They also believed that employees should be familiar with activities throughout the organization so that cooperation between departments would be increased. A newer member of the industrial engineering department said, “When I first got here, I wasn’t sure what I was supposed to do. One day I worked with some mechanical engineers and the next day I helped the shipping department design some packing cartons. The first months on the job were hectic, but at least I got a real feel for what makes Omega tick.”

Part II

In the 1990s, mixed analog and digital devices began threatening the demand for the complex circuit boards manufactured by Acme and Omega. This system-on-a-chip technology combined analog functions, such as sound, graphics, and power management, together with digital circuitry, such as logic and memory, making it highly useful for new products such as cellular phones and wireless computers. Both Acme and Omega realized the threat to their futures and began aggressively to seek new customers.

In July 1992, a major photocopier manufacturer was looking for a subcontractor to assemble the digital memory units of its new experimental copier. The projected contract for the job was estimated to be $7 million to $9 million in annual sales.

Both Acme and Omega were geographically close to this manufacturer, and both submitted highly competitive bids for the production of 100 prototypes. Acme’s bid was slightly lower than Omega’s; however, both firms were asked to produce 100 units. The photocopier manufacturer told both firms that speed was critical because its president had boasted to other manufacturers that the firm would have a finished copier available by Christmas. This boast, much to the designer’s dismay, required pressure on all subcontractors to begin prototype production before the final design of the copier was complete. This meant Acme and Omega would have at most two weeks to produce the prototypes or would delay the final copier production.

Part III

Inside Acme

As soon as John Tyler was given the blueprints (Monday, July 13, 1992), he sent a memo to the purchasing department asking to move forward on the purchase of all necessary materials. At the same time, he sent the blueprints to the drafting department and asked that it prepare manufacturing prints. The industrial engineering department was told to begin methods design work for use by the production department supervisors. Tyler also sent a memo to all department heads and executives indicating the critical time constraints of this job and how he expected that all employees would perform as efficiently as they had in the past.

The departments had little contact with one another for several days, and each seemed to work at its own speed. Each department also encountered problems. Purchasing could not acquire all the parts on time. Industrial engineering had difficulty arranging an efficient assembly sequence. Mechanical engineering did not take the deadline seriously and parceled its work to vendors so the engineers could work on other jobs scheduled previously. Tyler made it a point to stay in touch with the photocopier manufacturer to let it know things were progressing and to learn of any new developments. He traditionally worked to keep important clients happy. Tyler telephoned someone at the photocopier company at least twice a week and got to know the head designer quite well.

On July 17, Tyler learned that mechanical engineering was far behind in its development work, and he “hit the roof.” To make matters worse, purchasing had not obtained all the parts, so the industrial engineers decided to assemble the product without one part, which would be inserted at the last minute. On Thursday, July 23, the final units were being assembled, although the process was delayed several times. On Friday, July 24, the last units were finished while Tyler paced around the plant. Late that afternoon, Tyler received a phone call from the head designer of the photocopier manufacturer, who told Tyler that he had received a call on Wednesday from Jim Rawls of Omega. He explained that Rawls’s workers had found an error in the design of the connector cable and taken corrective action on their prototypes. He told Tyler that he had checked out the design error and that Omega was right. Tyler, a bit overwhelmed by this information, told the designer that he had all the memory units ready for shipment and that, as soon as they received the missing component on Monday or Tuesday, they would be able to deliver the final units. The designer explained that the design error would be rectified in a new blueprint he was sending over by messenger and that he would hold Acme to the Tuesday delivery date.

When the blueprint arrived, Tyler called in the production supervisor to assess the damage. The alterations in the design would call for total disassembly and the unsoldering of several connections. Tyler told the supervisor to put extra people on the alterations first thing Monday morning and to try to finish the job by Tuesday. Late Tuesday afternoon, the alterations were finished and the missing components were delivered. Wednesday morning, the production supervisor discovered that the units would have to be torn apart again to install the missing component. When John Tyler was told this, he again “hit the roof.” He called industrial engineering and asked if it could help out. The production supervisor and the methods engineer couldn’t agree on how to install the component. John Tyler settled the argument by ordering that all units be taken apart again and the missing component installed. He told shipping to prepare cartons for delivery on Friday afternoon.

On Friday, July 31, 50 prototypes were shipped from Acme without final inspection. John Tyler was concerned about his firm’s reputation, so he waived the final inspection after he personally tested one unit and found it operational. On Tuesday, August 4, Acme shipped the last 50 units.

Inside Omega

On Friday, July 10, Jim Rawls called a meeting that included department heads to tell them about the potential contract they were to receive. He told them that as soon as he received the blueprints, work could begin. On Monday, July 13, the prints arrived and again the department heads met to discuss the project. At the end of the meeting, drafting had agreed to prepare manufacturing prints, while industrial engineering and production would begin methods design.

Two problems arose within Omega that were similar to those at Acme. Certain ordered parts could not be delivered on time, and the assembly sequence was difficult to engineer. The departments proposed ideas to help one another, however, and department heads and key employees had daily meetings to discuss progress. The head of electrical engineering knew of a Japanese source for the components that could not be purchased from normal suppliers. Most problems were solved by Saturday, July 18.

On Monday, July 20, a methods engineer and the production supervisor formulated the assembly plans, and production was set to begin on Tuesday morning. On Monday afternoon, people from mechanical engineering, electrical engineering, production, and industrial engineering got together to produce a prototype just to ensure that there would be no snags in production. While they were building the unit, they discovered an error in the connector cable design. All the engineers agreed, after checking and rechecking the blueprints, that the cable was erroneously designed. People from mechanical engineering and electrical engineering spent Monday night redesigning the cable, and on Tuesday morning, the drafting department finalized the changes in the manufacturing prints. On Tuesday morning, Rawls was a bit apprehensive about the design changes and decided to get formal approval. Rawls received word on Wednesday from the head designer at the photocopier firm that they could proceed with the design changes as discussed on the phone. On Friday, July 24, the final units were inspected by quality control and were then shipped.

Part IV

Ten of Acme’s final memory units were defective, whereas all of Omega’s units passed the photocopier firm’s tests. The photocopier firm was disappointed with Acme’s delivery delay and incurred further delays in repairing the defective Acme units. However, rather than give the entire contract to one firm, the final contract was split between Acme and Omega with two directives added: maintain zero defects and reduce final cost. In 1993, through extensive cost-cutting efforts, Acme reduced its unit cost by 20 percent and was ultimately awarded the total contract.

The Homework Market
Order NOW For A 10% Discount!
Pages (550 words)
Approximate price: -

Why Choose Us

Top quality papers

We always make sure that writers follow all your instructions precisely. You can choose your academic level: high school, college/university or professional, and we will assign a writer who has a respective degree.

Professional academic writers

We have hired a team of professional writers experienced in academic and business writing. Most of them are native speakers and PhD holders able to take care of any assignment you need help with.

Free revisions

If you feel that we missed something, send the order for a free revision. You will have 10 days to send the order for revision after you receive the final paper. You can either do it on your own after signing in to your personal account or by contacting our support.

On-time delivery

All papers are always delivered on time. In case we need more time to master your paper, we may contact you regarding the deadline extension. In case you cannot provide us with more time, a 100% refund is guaranteed.

Original & confidential

We use several checkers to make sure all papers are plagiarism-free and do not share them with third parties.

24/7 Customer Support

Our support agents are available 24 hours a day 7 days a week and committed to providing you with the best customer experience. Get in touch whenever you need any assistance.

Try it now!

Calculate the price of your order

We'll send you the first draft for approval by at
Total price:
$0.00

How it works?

Follow these simple steps to get your paper done

Place your order

Fill in the order form and provide all details of your assignment.

Proceed with the payment

Choose the payment system that suits you most.

Receive the final file

Once your paper is ready, we will email it to you.

Our Services

No need to work on your paper at night. Sleep tight, we will cover your back. We offer all kinds of writing services.

Essays

Essay Writing Service

You are welcome to choose your academic level and the type of your paper. Our academic experts will gladly help you with essays, case studies, research papers and other assignments.

Admissions

Admission help & business writing

You can be positive that we will be here 24/7 to help you get accepted to the Master’s program at the TOP-universities or help you get a well-paid position.

Reviews

Editing your paper

Our academic writers and editors will help you submit a well-structured and organized paper just on time. We will ensure that your final paper is of the highest quality and absolutely free of mistakes.

Reviews

Editing your paper

Our academic writers and editors will help you submit a well-structured and organized paper just on time. We will ensure that your final paper is of the highest quality and absolutely free of mistakes.

× Contact Live Agents